|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The
Construction begins... |
|
|
|
|
|
|
|
 |
 |
 |
|
Pile-driving for the jetty |
|
|
|
Permanent approach road to the jetty |
|
 |
 |
 |
|
|
|
|
Soil-Stabilization in progress |
|
 |
 |
 |
|
|
|
Pumping out sand to the reclamation area |
|
|
View of the loaded Dredger |
|
 |
 |
 |
|
Rail Over Road at Bhadrak |
|
|
Pumping out sand to the reclamation area |
|
|
Ground Preparation for
Rail Corridor (I)r |
|
 |
 |
 |
|
Ground Preparation for
Rail Corridor (II) |
|
|
Ground Preparation for
Rail Corridor (III) |
|
|
Site Office at Charampa,Bhadrak |
|
 |
 |
 |
|
Batching Plant at Charampa,Bhadrak |
|
|
Approach Road to
Port Site Office |
|
|
 |
 |
 |
|
Port Site Office at Dhamra |
|
|
Fabrication Yard at Dhamra |
|
|
Batching Plant at
Dhamra (I) |
|
|
|
 |
|
|
|
|
Batching Plant at Dhamra (II) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Privacy Policy
|
Legal Disclaimer
Copyright © 2006, The Dhamra Port Company Limited.
|